VS

Home > Care Homes UK > Brendoncare Ronald Gibson House - London

Brendoncare Ronald Gibson House - London

Details Rankings Comparisons Related
Brendoncare Ronald Gibson House - London
Compare with other Care Homes UK
 Compare
Brendoncare Ronald Gibson House - London VS
All other Care Homes UK
General
Street Address 236 Burntwood Lane, Tooting 
Local Authority / Social Services London Borough Of Wandsworth Council  vs 0.2% Care Homes UK have London Borough of Wandsworth Council
Locality London  vs 3.9% Care Homes UK have London
Local Authority Area Wandsworth 
Single Rooms
56  (31.16 higher than average)
vs
24.84

Rooms with ensuite WC
56  (33.79 higher than average)
vs
22.21

Facilities & Services Palliative Care
Respite Care
Convalescent Care
Physiotherapy
Separate Emi Unit
Own Gp If Required
Own Furniture If Required
Pets By Arrangement
Smoking Not Permitted
Near Public Transport
Minibus Or Other Transport
Lift
Wheelchair Access
Gardens For Residents
Residents Kitchenette
Phone Point In Own Room/mobile
Television Point In Own Room 

Specialist Care Alzheimer's 
Specialisms/services Dementia
Diagnostic And/or Screening Services
Caring For Adults Over 65 Yrs 

Last Inspection Date 1 February 2012, 6 And 30 December 2010 
Last Report Date 1 March 2012, 16 February 2011 
Organisation The Brendoncare Foundation  vs 0.1% Care Homes UK have The Brendoncare Foundation
website brendoncare Ronald Gibson House Website 
Contact details
Address 236 Burntwood Lane, Tooting, London, Sw17 0an 
Phone (020) 8877 9998  
Standard
Standard 1 Overall: Improvements
required 

Standard 2 Overall: Improvements
required 

Standard 3 Overall: Meeting This Standard 
Standard 4 Overall: Improvements
required 

Standard 5 Overall: Improvements
required 

# of standards being met
(3.84 lower than average)
vs
4.84

Outcome
outcome 1 Improvements Required 
outcome 2 Meeting This Standard 
outcome 4 Improvements Required 
outcome 5 Meeting This Standard 
outcome 6 Meeting This Standard 
outcome 7 Meeting This Standard 
outcome 8 Meeting This Standard 
outcome 9 Meeting This Standard 
outcome 10 Meeting This Standard 
outcome 11 Meeting This Standard 
outcome 12 Meeting This Standard 
outcome 13 Meeting This Standard 
outcome 14 Improvements Required 
outcome 16 Meeting This Standard 
outcome 17 Meeting This Standard 
outcome 21 Improvements Required 
outcome 24 Improvements Required 
# of outcomes being met
12  (3.66 lower than average)
vs
15.66

# of outcomes need improvement
(2.83 higher than average)
vs
2.17



Scroll To Top

saved